BBR Stay Cable Technologies

For decades, BBR has offered the very best, state-of-the-art technology for cable-stayed structures and today this is backed by over 60 years of specialist technical know-how. BBR was also the inventor of strand and carbon stay cables - and carried out the world’s first projects using high fatigue resistant wire, strand and carbon stay cables.

Seri Saujana Bridge BR8 Putrajaya (Malaysia) by BBR Network Member BBR Construction Systems

BBR Strand stay cable

HiAm CONA
Strand stay cable system
HiEx CONA
Strand saddle system

BBR Wire stay cable

BBR Carbon stay cable

DINA HiAm BBR Carbon
Carbon stay cable

400 reasons to choose the BBR Network

Go to the Download page

Fifty years – 400 structures

While many cable suppliers only built their first major cable supported structure in the late 1970’s and early 1980’s, the BBR Network installed the first stay cables in the late 1950’s. Since then, BBR Stay Cable Technology has been applied to over 400 major structures around the world – including Japan’s breathtaking Tatara Bridge which has the longest main span to be constructed in the 20th Century.