Technologies
BBR Worldwide
BBR VT International Ltd
Bahnstrasse 23
8603 Schwerzenbach
Switzerland
Tel  +41 44 806 80 60
Fax +41 44 806 80 50
info@bbrnetwork.com

© Copyright BBR VT

BBR CONA CMI

Massive test success for BBR Large Capacity Tendons

BBR is delighted to announce the successful testing of the BBR VT CONA CMI - Large Capacity Tendons, the new generation post-tensioning system using seven-wire prestressing steel.  This system has been especially developed to meet the demands of the new generation Nuclear Containment Vessels. The recent tests – all based on the latest international requirements for post-tensioning systems – were on the largest scale ever executed.

01. March 2007

< previous | 23 of 40 News | next >