Search

Search words under length of 4 characters are not processed.
141 results:
21. BBR Network project wins PTI Award  
… Zealand has been named the winner in the Slab-on-Ground category. BBR Contech constructed the warehouse…  
22. BBR Network strengthens three dams  
… Australia’s Wellington Dam, the world’s largest ground anchors are being installed. These are equal in…  
23. KB VT Temporary Stay Cables  
… for the closure of the arch around 200 m above the ground. The arch segments will be carried by 31 sets of…  
24. CONNÆCT 2017 published  
… advanced monostrand post-tensioning system – BBR VT CONA CMM single S2 – which offers many advantages, plus a…  
25. Sustainable investment in PT  
CONA CMM system installed in new mall  
26. BBR beats own record  
… the successful testing of the high capacity BBR VT CONA CMI tendons with up to 61 seven-wire prestressing…  
27. New sensing technology  
… stay cable monitoring, bridge load control, ground anchor monitoring and many more. WIGAbloc load cells…  
28. Almonte Viaduct (Spain)  
… route. A temporary system consisting of 208 HiAm CONA 5506 and 3706 stay cables is being installed by the…  
29. BBR Network work-of-art for Aquaparc  
… tallest lamellas are post-tensioned with BBR VT CONA CMI internal tendons.  
30. BBR Contech celebrates 50 years  
… an outstanding reputation for post-tensioning, ground anchoring, seismic strengthening, construction…  
Search results 21 until 30 of 141