… close to Traismauer, is at the heart of a new 6.6 km road link and features both external BBR VT CONA CMB band, as well as BBR VT CONA CMI internal post-tensioning.The project consists of the foreland…
… its revolutionary new load transfer system and by utilizing state-of-the-art materials, the BBR VT CONA CMI Post-tensioning System (European Technical Approval ETA 06/0147) allows closer anchor spacing, …
…est success for BBR Large Capacity Tendons
BBR is delighted to announce the successful testing of the BBR VT CONA CMI - Large Capacity Tendons, the new generation post-tensioning system using seven-wire prestressing…
…European Technical Approval
BBR launches the BBR VT CONA CMM Unbonded Post-tensioning System (European Technical Approval – ETA 06/0165). The CONA CMM complies with the latest international requirements for…
…Now European approved
We are delighted to announce that the BBR VT CONA CMF BT Internal Post-tensioning System with Flat Anchorages has now obtained European Technical Approval ETA.The new CONA CMF contains the latest…
…Most advanced and highly versatile multi-strand PT technology
The BBR VT CONA CMI internal bonded or unbonded system is the most advanced multi-strand post-tensioning technology on the international market. Now a video…
… is now available for download!
The System Specification represents the second volume in the two-part CONA CMX series and is the ultimate ‘must-have’ guide for engineers to quickly and efficiently find all the…
New BBR Viscous Damper & Damping System Brochure
In response to recent competitive tendering bids, BBR VT has developed a viscous strand stay cable damper to compliment the existing friction based