21. Nuclear Energy  
… pioneers in the truest sense of the word when it came to developing high capacity post-tensioning tendons for nuclear applications. Today, the BBR team has completed close to 100 nuclear energy projects in…  
22. Towering technology  
… weight of the twelve floors above them. Different BBR solutions - such as BBR CONA multiple strand tendons, bars, SWIF couplers for rebar and complex heavy-lifting operations - have been applied and…  
23. BBR Project of 2009  
… a design based on balanced cantilever construction using form travelers was adopted. BBR CONA tendons were installed for the spans and cantilever to build the structure in an efficient and timely manner…  
24. Five new BBR Network publications now available  
… around the globe.BBR stay cables – fifty years of excellence in over 400 major projects.BBR nuclear tendons – powerful and trusted nuclear technology applied in over 65 facilities.  
25. Latest BBR VT CONA CMI approvals now online  
… PT system on the market. Re-stressable, exchangeable or electrically isolated CONA CMI tendons are available, as well as tendons for cryogenic and nuclear applications. The CONA CMI BT (bearing…  
26. Ringhals nuclear power station  
… with the management of BBR VT International visited the post-tensioning works project, using BBR tendons, at Ringhals nuclear power station in Sweden. For the installation of new steam generators at …  
27. Taking high speed rail to border  
… of 14 spans with lengths ranging from 45 m to 70 m. To improve distribution of the PT forces, ten tendons with 31 strands and stressing anchorages in both ends were used for the longitudinal tendons running…  
28. Cable-stayed roof for state-of-the-art venue  
… achieved. To create the iconic roof, we used a 22-strand BBR VT CONA CME system consisting of 40 tendons, each guided through HDPE pipes. Twenty one tendons are load-bearing and have a concave layout,…  
29. BBR Network delivers quality for energy  
… 600,000 kg of post-tensioning steel was used in each tank, divided between vertical and horizontal tendons.A key factor is the choice of grout – we chose a thixotropic grout for grouting the tendons. In…  
30. Quality – and economy – for Polish office projects  
… based on using BBR VT CONA CMM post-tensioning technology, delivery, installation and stressing of tendons, plus delivery and installation of anchorage zone reinforcement.The Business Garden Warsaw …  