Search

Search words under length of 4 characters are not processed.
131 results:
101. International venue in Croatia  
… surrounding the Arena to support the roof structure. The lamellas, prestressed using the BBR VT CONA CMI system, were prefabricated on site, lifted into position by crane and fixed to the building. The…  
102. BBR nuclear tendons  
… have been carrying out lift-off tests and routine cable inspections and replacements. The BBR VT CONA CMI system for nuclear applications has secured European Technical Approval ETA - and set a new world…  
103. Update on BBR Technologies and techniques in Croatia  
… BBR HQ took delegates through the certification and testing of European Approved PT systems, the CONA CMX series and  stay cable technology, while Thomas Richli talked about bridge construction …  
104. Stay cable technology seminar  
… Companies are always one step ahead. With outstanding stay cable systems such as BBR HiAm CONA, BBR DINA/HiAm and Carbon in their portfolio, the BBR Network has completed more than 300 stay cable …  
105. Recognition for Spain’s Almonte Bridge  
… who provided expertize for the installation - and subsequent dismantling - of the 208 BBR HiAm CONA stay cables which were used as temporary supports while the arch segments were being cast in sequence…  
106. Almonte Viaduct (Spain)  
… Alcantara reservoir, on the Madrid to Extremadura route. A temporary system consisting of 208 HiAm CONA 5506 and 3706 stay cables is being installed by the BBR Network Member BBR PTE during the concreting of…  
107. BBR Network work-of-art for Aquaparc  
… lamellas varies depending on roof level and the tallest lamellas are post-tensioned with BBR VT CONA CMI internal tendons.  
108. Latest BBR PT technology also available in SA  
… BBR PT Specialist enabling them to provide the latest European approved and CE-marked BBR VT CONA CMX technology. Following on from Structural Systems Middle East in the United Arab Emirates and Marwan…  
109. Durability of BBR technology proven - again  
… cable-stayed bridges when completed in 2002, has a single 160m tall Y-shaped pylon from which 84 BBR CONA stay cables are arranged. A team from BBR Headquarters R&D and local BBR Network Member, BBR…  
110. Updated LNG Project Reference List  
… under extreme conditions. The successful test results verify the ductility performance of the BBR VT CONA CMI post-tensioning system and prove that it is in full compliance with the ETAG 013 testing regime…  
Search results 101 until 110 of 131