Search

Search words under length of 4 characters are not processed.
141 results:
121. Updated LNG Project Reference List  
… verify the ductility performance of the BBR VT CONA CMI post-tensioning system and prove that it is in…  
122. Basarab Bridge (RO)  
… be executed in joint venture by BBR PTE. BBR’s HiAm CONA stay cable technology - developed and tested for leak…  
123. BBR Project of 2009  
… construction using form travelers was adopted. BBR CONA tendons were installed for the spans and cantilever…  
124. Quality – and economy – for Polish office projects  
… design for floor slabs based on using BBR VT CONA CMM post-tensioning technology, delivery, …  
125. BBR Network delivers quality for energy  
… and technologies should be used – hence the BBR VT CONA CMI system for cryogenic applications was chosen for…  
126. Geotecnia  
… Obtenga más información sobre nuestro sistem CONA CMG. …  
127. Energía  
CONA CMI internal CONA CMB band CONA CMG Geotechnics …  
128. Taking high speed rail to border  
… of the high speed railway line. The BBR VT CONA CMI system was used for all four viaducts. The Rio…  
129. Zagreb Arena honored as BBR Project of the Year 2010  
… which is achievable with leading-edge BBR VT CONA CMI post-tensioning technology.  
130. BBR Network speeds bridge construction  
… provide easy access to the venue.We used the BBR VT CONA CMI system on all three bridges – the longest …  
Search results 121 until 130 of 141