… in the north west of Bucharest and will be executed in joint venture by BBR PTE. BBR’s HiAm CONA stay cable technology - developed and tested for leak tightness, high fatigue resistance and high…
… progress, a design based on balanced cantilever construction using form travelers was adopted. BBR CONA tendons were installed for the spans and cantilever to build the structure in an efficient and timely…
… and Szczecin projects covered delivery of alternative design for floor slabs based on using BBR VT CONA CMM post-tensioning technology, delivery, installation and stressing of tendons, plus delivery and…
… strong winds. Only the best construction material and technologies should be used – hence the BBR VT CONA CMI system for cryogenic applications was chosen for the post-tensioning.The two vessels are…
… - and three other viaducts - which complete this section of the high speed railway line. The BBR VT CONA CMI system was used for all four viaducts.
The Rio Fluvià Viaduct is a box girder bridge consisting of…
… features a dedicated road and bridge network to provide easy access to the venue.We used the BBR VT CONA CMI system on all three bridges – the longest prestressing tendons on the project measured an…
… atirantados de cordones BBR HiAm en el Estadio Olímpico de Múnich 1972 Desarrollo del sistema BBR CONA PT 1978 Primera torre del mundo sustentada con cables, la Torre de Sídney, Australia…