Suchbox

34 Treffer:
31. CONA CMF Flat Post-tensioning system  
… Approval ETA.The new CONA CMF contains the latest post-tensioning technology for flat slabs requiring PT tendons with 02, 03 and 04 strands. The system is based on 0.5” (93 mm² and 100 mm²) and 0.6” (140 mm² and…  
32. European Project Manager\'s Workshop  
… Project Managers and engineers from across Europe gathered for 3 days focusing on pre-fabricated PT tendons for accelerating on-site activities and the high performance characteristics of BBR VT\'s range of…  
33. BBR Adria builds on practical & versatile solutions  
… solutions with BBR technology since 2011 for such buildings in Croatia. Around 20t of BBR VT CONA CMM tendons were embedded in each building – each of which feature floor areas of 800m2. There are many benefits…  
34. BBR Network work-of-art for Aquaparc  
… depending on roof level and the tallest lamellas are post-tensioned with BBR VT CONA CMI internal tendons.  
Suchergebnisse 31 bis 34 von 34