Suchbox

Bitte beachten Sie: Suchbegriffe unter einer Länge von 4 Buchstaben werden ignoriert.
141 Treffer:
31. KB VT Temporary Stay Cables  
… for the closure of the arch around 200 m above the ground. The arch segments will be carried by 31 sets of…  
32. CONNÆCT 2017 published  
… advanced monostrand post-tensioning system – BBR VT CONA CMM single S2 – which offers many advantages, plus a…  
33. Sustainable investment in PT  
CONA CMM system installed in new mall  
34. BBR beats own record  
… the successful testing of the high capacity BBR VT CONA CMI tendons with up to 61 seven-wire prestressing…  
35. New sensing technology  
… stay cable monitoring, bridge load control, ground anchor monitoring and many more. WIGAbloc load cells…  
36. Almonte Viaduct (Spain)  
… route. A temporary system consisting of 208 HiAm CONA 5506 and 3706 stay cables is being installed by the…  
37. BBR Network work-of-art for Aquaparc  
… tallest lamellas are post-tensioned with BBR VT CONA CMI internal tendons.  
38. BBR Contech celebrates 50 years  
… an outstanding reputation for post-tensioning, ground anchoring, seismic strengthening, construction…  
39. 2015 Special BBR Network Awards  
… almost TWO MILLION square meters of post-tensioned ground slabs installed in around 300 separate building…  
40. BBR Network Project of the Year  
… knowledge and experience of post-tensioned slab-on-ground construction, as well as their passion for custsomer…  
Suchergebnisse 31 bis 40 von 141