Suchbox

34 Treffer:
1. New video about BBR Electrically Isolated Tendon range  
…Most advanced and most durable PT solution for structures The BBR Electrically Isolated Tendon (EIT) range is the most advanced and most durable post-tensioning solution for structures. This new video explains what EIT…  
2. BBR beats own record  
…BBR tendon takes load of more than seven Airbus A380 aircrafts.  
3. BBR Network speeds bridge construction  
…Innovative engineering solution for timely handover A more efficient layout for tendon couplers, devised by the BBR Network, saved the main contractor precious time in the construction schedule of three bridges in…  
4. BBR VT Plastic Duct & Accessories Brochure  
… eliminate the need for using heat-shrink sleeves, protective half shells for added durability at tendon low/high points, precast segmental couplers providing state-of-the-art air and water tight connections…  
5. BBR VT CONA CME  
… VT CONA CME External Post-tensioning System (European Technical Approval – ETA 07/0168). The CONA CME tendons consist of 1 to 31 seven-wire prestressing strands with a nominal diameter / nominal cross section…  
6. ETA for BBR VT CONA CMI with new key features  
… Assessment incorporates new key features which extend the use of the system for the most advanced tendon types, a wide range of newly devleoped advanced BBR Network grouting accessories, plus a recently…  
7. CONNÆCT 2016 published  
… section, we take a detailed look at the European assessed BBR VT CONA CMI Electrically Isolated Tendon (EIT) - the most advanced multi-strand post-tensioning system with the highest possible level of…  
8. Elegance and strength  
… on the international market place and is backed by 50 years of BBR stay cable experience. Its high tendon capacity from 200 to 60,000 kN, its superior fatigue resistance, compact anchorage design and high…  
9. BBR nuclear tendons  
… of post-tensioning products, it will be no surprise that BBR tested their first high capacity tendons for nuclear power stations in the 1960s. Since then, the BBR Network has applied this leading edge…  
10. Q22 high-rise buildings opens  
… BBR Polska began work on this prestigious project in 2014 and, as well as delivering the detailed tendon layout, also installed almost 2,000 post-tensioning tendons. They used the BBR VT CONA CMF flat system…  
Suchergebnisse 1 bis 10 von 34