… upgrading to meet revised safety standards, the permanent anchoring and trunnion restraint tendons on the Ross River Dam helps securing the local community. This project is a perfect example of a…
… pioneers in the truest sense of the word when it came to developing high capacity post-tensioning tendons for nuclear applications. Today, the BBR team has completed close to 100 nuclear energy projects in…
… layout with 84 tons of bonded posttensioning BBR VT CONA CMI 1206, and 42 tons of external tendons BBR VT CONA CMB 1606. Posttensioning works on the bridge deck started in June 2014 and could…
… The installation of the 970 precast concrete segments and some 600t of BBR VT CONA CMI internal PT tendons is being carried out by ETIC, the BBR Network Member for France.
… weight of the twelve floors above them. Different BBR solutions - such as BBR CONA multiple strand tendons, bars, SWIF couplers for rebar and complex heavy-lifting operations - have been applied and…
… a design based on balanced cantilever construction using form travelers was adopted. BBR CONA tendons were installed for the spans and cantilever to build the structure in an efficient and timely manner…
… around the globe.BBR stay cables – fifty years of excellence in over 400 major projects.BBR nuclear tendons – powerful and trusted nuclear technology applied in over 65 facilities.
… PT system on the market. Re-stressable, exchangeable or electrically isolated CONA CMI tendons are available, as well as tendons for cryogenic and nuclear applications. The CONA CMI BT (bearing…
… with the management of BBR VT International visited the post-tensioning works project, using BBR tendons, at Ringhals nuclear power station in Sweden. For the installation of new steam generators at …