Search

53 results:
41. Construction Methods  
… girder spanning between a pair of adjacent permanent piers Installing and stressing longitudinal PT tendons enabling the segments to span on their own Advancing the erection girder into place to erect the…  
42. Maintenance - MRR  
… 0 The use of externally placed post-tensioning tendons to increase load carrying capacity is a well-established practice. In principle, induced tensile…  
43. CONA CMM Two/Four  
… post-tensioning system is a monostrand system for internally unbonded applications. The standard tendons have 2 or 4 strand configurations. Typical applications include suspended slabs of any building…  
44. Taking high speed rail to border  
… of 14 spans with lengths ranging from 45 m to 70 m. To improve distribution of the PT forces, ten tendons with 31 strands and stressing anchorages in both ends were used for the longitudinal tendons running…  
45. Cable-stayed roof for state-of-the-art venue  
… achieved. To create the iconic roof, we used a 22-strand BBR VT CONA CME system consisting of 40 tendons, each guided through HDPE pipes. Twenty one tendons are load-bearing and have a concave layout,…  
46. BBR Network delivers quality for energy  
… 600,000 kg of post-tensioning steel was used in each tank, divided between vertical and horizontal tendons.A key factor is the choice of grout – we chose a thixotropic grout for grouting the tendons. In…  
47. Quality – and economy – for Polish office projects  
… based on using BBR VT CONA CMM post-tensioning technology, delivery, installation and stressing of tendons, plus delivery and installation of anchorage zone reinforcement.The Business Garden Warsaw …  
48. CONA CMF Flat Post-tensioning system  
… Approval ETA.The new CONA CMF contains the latest post-tensioning technology for flat slabs requiring PT tendons with 02, 03 and 04 strands. The system is based on 0.5” (93 mm² and 100 mm²) and 0.6” (140 mm² and…  
49. European Project Manager\'s Workshop  
… Project Managers and engineers from across Europe gathered for 3 days focusing on pre-fabricated PT tendons for accelerating on-site activities and the high performance characteristics of BBR VT\'s range of…  
50. BBR Adria builds on practical & versatile solutions  
… solutions with BBR technology since 2011 for such buildings in Croatia. Around 20t of BBR VT CONA CMM tendons were embedded in each building – each of which feature floor areas of 800m2. There are many benefits…  
Search results 41 until 50 of 53