Search

Search words under length of 4 characters are not processed.
86 results:
61. Best yet in Bangkok  
…Global BBR Conference 2015 The 2015 Global BBR Network Conference, held in Bangkok at the end of April, was declared by…  
62. Benefits for New Zealand car park  
… sympathetic car park was soon required. The BBR Network’s post-tensioned solution has now delivered a …  
63. Strong and sustainable solutions for education sector  
…BBR Network completes four major projects  
64. Project of the Year 2014  
… and 3rd longest in the world. Australian BBR Network Member, Structural Systems, worked closely with the…  
65. Speedy infrastructure partnership  
…BBR Network member Spennteknikk is working hand-in-hand with main contractor Skanska on an ambitious motorway project…  
66. Speedy Precast Segment Casting  
… weighing between 80-100 t were delivered to the working fronts by barge and then erected by launching…  
67. Long-term PT flooring partnership  
…BBR Network delivers 350,000m2 of PT floors for regular customer  
68. Benchmark for prestressed concrete technology  
… construction industry. KB Vorspann-Technik works internationally in close cooperation with our…  
69. Introducing the BBR WT Bar System  
… multi-layer corrosion protection. Using the BBR Network’s long experience of working with load bearing…  
70. Bridge goes BBR  
… Bridge in Brisbane (Australia), where the BBR Network Member STRUCTURAL SYSTEMS is about to complete the…  
Search results 61 until 70 of 86